Transferring Pedestrians and Utilities During Demolition and Build of a 75-Year-Old-Bridge
Using a combination of 24m and 18m box girder deck unit to transfer pedestrians and utilities to the other side.
Custom built solutions for the construction, events, film, and rail industries.
Whether you need a temporary bridge for a construction site, film set, railway station or an international festival we’ll obtain all the correct licenses and work with local authorities on road closures. All bridges are signed off by Scott White and Hookins, our consultant engineers.
Maintaining access around construction sites is one of the most challenging aspects of site management. Our temporary bridges serve as indispensable assets for the construction industry, enabling projects to be completed on time, on budget, and with a heightened focus on safety and environmental responsibility. Our focus is on safety first: as a SSIP and Constructionline Gold compliant company, you can take one thing off your project list.
Bridges vary hugely in the footfall they need to support, the space that’s available and the aesthetic required. We’ll work with you to design the perfect solution for your event and then alongside you, liaising with local authorities and safety bodies, to ensure effective installation and minimum disruption.
For those seeking a comprehensive platform-to-platform solution catering to passengers and station staff during repair and refurbishment projects, or a versatile bridge for service diversion needs, our team is at your service. Our company is a RISQS registered audited company, with a dedicated group of PTS-qualified installation engineers. We possess the expertise to adeptly oversee the efficient installation process. Drawing from our extensive experience in the railway sector, we typically manage installations within a single possession window, thereby minimising disruptions to the general public while ensuring the swift restoration of operational platforms.
Using a combination of 24m and 18m box girder deck unit to transfer pedestrians and utilities to the other side.
Selby Station needed a temporary footbridge. Our Lightweight 18-metre-long U-Frame bridge was perfect for the job.
The £1.3 billion project requires uninterrupted access routes are required during the extensive construction activities.
Limited space on this exclusive regeneration project in West London required a unique solution.